Will “Preconstruction Manager” be Replaced By Robots? 🤔
100 % Chance of Automation
“Preconstruction Manager” will definitely be replaced by robots.
This job is ranked #321 out of #702. A higher ranking (i.e., a lower number) means the job is less likely to be replaced.
Care to share? Click for Facebook, Twitter, LinkedIn, or XING. 👍
Job Description
Prepare cost estimates for product manufacturing, construction projects, or services to aid management in bidding on or determining price of product or service. May specialize according to particular service performed or type of product manufactured.
Job Details
- The SOC (Standard Occupational Classification) code is 13-1051.00
- The Mean Annual Wage in the U.S. is $ 66,620.00
- The Mean Hourly Wage is $ 32.00
- Currently, there are 214,610 people on this job
☝️ Information based on the reference occupation “Cost Estimators”.
Also Known As…
- Cost Estimators
- Estimator Project Manager
- Estimator
- Cost Estimator
- Cost Engineer
- Cost Consultant
- Cost and Risk Analysis Manager
- Cost Analyst
- Construction Estimator
- Acquisition Cost Estimator
- Service Advisor
- Quantity Surveyor
- Project Estimator
- Production Cost Estimator
- Procurement Technician
- Preconstruction Manager
- Job Estimator
- Job Cost Estimator
- Investment Recovery Technician
- Electrical Estimator
- Crating and Moving Estimator
- Cost Recovery Technician
- Contract Analyst
- Construction Job Cost Estimator
- Chief Estimator
- Building Estimator
- Building Construction Estimator
Tasks for “Preconstruction Manager”
- Collect historical cost data to estimate costs for current or future products.
- Consult with clients, vendors, personnel in other departments or construction foremen to discuss and formulate estimates and resolve issues.
- Visit site and record information about access, drainage and topography, and availability of services such as water and electricity.
- Prepare estimates for use in selecting vendors or subcontractors.
- Assess cost effectiveness of products, projects or services, tracking actual costs relative to bids as the project develops.
- Analyze blueprints and other documentation to prepare time, cost, materials, and labor estimates.
- Review material and labor requirements to decide whether it is more cost-effective to produce or purchase components.
- Prepare cost and expenditure statements and other necessary documentation at regular intervals for the duration of the project.
- Conduct special studies to develop and establish standard hour and related cost data or to effect cost reduction.
- Prepare estimates used by management for purposes such as planning, organizing, and scheduling work.
- Establish and maintain tendering process, and conduct negotiations.
- Confer with engineers, architects, owners, contractors and subcontractors on changes and adjustments to cost estimates.
- Set up cost monitoring and reporting systems and procedures.
- Prepare and maintain a directory of suppliers, contractors and subcontractors.
Related Technology & Tools
- Tablet computers
- Scanners
- Personal computers
- Desktop computers
- Notebook computers
- Personal digital assistants PDA
- Oracle Hyperion
- CPR Visual Estimator
- Oracle JD Edwards EnterpriseOne
- SAP
- Resources Calculations Incorporated SoftCost
- Xactware Xactimate
- ConEst SureCount
- Galorath SEER-SEM
- Microsoft Business Contact Manager
- Microsoft Office
- Galorath SEER
- Microsoft Outlook
- Apple AppleWorks
- Sage 50 Accounting
- QSM SLIM
- HCSS HeavyBid
- CPR International GeneralCOST Estimator
- Cost accounting software
- Software AG
- Logic Software Easy Projects.NET
- ConEst JobTrac
- Cost estimation software
- ConEst IntelliBid Design Build
- PRICE Sytems TruePlanning
- WinEstimator WinEst
- Sage 100 Contractor
- Assured Software JPP
- Construction Management Software ProEst
- ConEst Intellibid
- SAP BusinessObjects Crystal Reports
- IBM Costimater
- Decisioneering Crystal Ball
- Dassault Systemes CATIA
- Corel QuattroPro
- Computer aided design and drafting CADD software
- HCSS HeavyJob
- Intuit QuickBooks
- Microsoft Visio
- Microsoft Word
- Autodesk Revit
- Laserfiche Avante
- Choice Job Cost
- ConEst Electrical Formulas
- Adobe Systems Adobe Acrobat
- Palisade @Risk
- Sage 300 Construction and Real Estate
- Oracle Primavera Enterprise Project Portfolio Management
- ConEst Permit Trac
- Autodesk AutoCAD
- Microsoft Excel
- Microsoft Project
- ConEst BidTrac
- Primavera Cost Management
- EFI Hagen OA
- ConEst T&M Billing Manager
- Microsoft PowerPoint
- IBM Lotus 1-2-3
- Microsoft Access
- Softstar Costar COCOMO II