Will “Interlocking Concrete Pavement Installer” be Replaced By Robots? 🤔
83% Chance of Automation
“Interlocking Concrete Pavement Installer” will probably be replaced by robots.
This job is ranked #464 out of #702. A higher ranking (i.e., a lower number) means the job is less likely to be replaced.
Care to share? Click for Facebook, Twitter, LinkedIn, or XING. 👍
Job Description
Lay out, cut, and place segmental paving units. Includes installers of bedding and restraining materials for the paving units.
Job Details
- The SOC (Standard Occupational Classification) code is 47-4091.00
- The Mean Annual Wage in the U.S. is $ 34,160.00
- The Mean Hourly Wage is $ 16.00
- Currently, there are 1,720 people on this job
☝️ Information based on the reference occupation “Segmental Pavers”.
Also Known As…
- Segmental Pavers
- Segmental Wall Installer
- Paving Stone Installer
- Paver Layer
- Paver Installer
- Paver
- Cutter
- Travertine Installer
- Slab Installer
- Segmental Paver Installer
- Paving Foreman
- Landscape Foreman
- Interlocking Pavement Installer
- Interlocking Installer
- Installer
- Concrete Paver
- Concrete Pavement Installer
- Bricklayer
Tasks for “Interlocking Concrete Pavement Installer”
- Discuss the design with the client.
- Cut paving stones to size and for edges, using a splitter and a masonry saw.
- Supply and place base materials, edge restraints, bedding sand and jointing sand.
- Resurface an outside area with cobblestones, terracotta tiles, concrete or other materials.
- Design paver installation layout pattern and create markings for directional references of joints and stringlines.
- Prepare base for installation by removing unstable or unsuitable materials, compacting and grading the soil, draining or stabilizing weak or saturated soils and taking measures to prevent water penetration and migration of bedding sand.
- Sweep sand into the joints and compact pavement until the joints are full.
- Cement the edges of the paved area.
- Sweep sand from the surface prior to opening to traffic.
- Compact bedding sand and pavers to finish the paved area, using a plate compactor.
- Set pavers, aligning and spacing them correctly.
- Screed sand level to an even thickness, and recheck sand exposed to elements, raking and rescreeding if necessary.
Related Technology & Tools
- Backhoes
- Paver washers
- Forklifts
- Paver layout squares
- Vibratory plate compactors
- Laser levels
- Slide hammers
- Lifting spreaders
- Base rakes
- Leaf blowers
- Rubber hammers
- Dump trucks
- Material hoists
- Masonry saws
- Paver block splitters
- Chop saws
- Sand screeding equipment
- Pressure washers
- Wheeled front end loaders
- Material moving cranes
- Paving edgers
- Pallet wagons
- Jackhammers
- Chainsaws
- Bandcutters
- Dust collectors
- Power brooms
- Paver adjusters
- Slab lifters
- Grout mixers
- Paver extractors
- Paver pullers
- Vacuum lifters
- Paver carts
- Chalk line markers
- Demolition hammers
- Skid steer loaders
- Table saws
- Hardscape mallets
- Paver brooms
- Mini excavators
- Fork-grapples
- Stone grinders
- Screed rails
- Paver scribers
- Depiction Software Deco-Con
- Depiction Software Deco-Con Estimating
- Web browser software
- UNI-GROUP Lockpave Pro
- Decorative Software Online Visualizers
- Depiction Software Hardscape Imaging